WASTEWATER COLLECTION AND TREATMENT DESIGN FOR THE MUNICIPALITY OF KALLITHEA, THESSALONIKI PREFECTURE

Client: Municipality of Kallithea
Year: 2006
Budget: 16.206.000€

ISSUE

The purpose of the project Οριζοντιογραφία οικισμού Ν.Φιλαδέλφειαςwas the final design of the:

SOLUTION 
The aforementioned communities were served by septic tanks. The produced wastewater was discharged untreated in the broader region resulting in the degradation of the natural environment and the quality of life for local residents.
 
The table below shows the total peak population of all communities, for each design phase.  

Peak Population of Served Communities
Community Population 2001 Projected Population in 2006Projected Population in 20 years
Projected Population in 40 years 
Monolofos 448 484 627 812
Petroto 326 352
422 591
N.Philadelfia
826 893 1.156 1.496
Mesaio 573 619 802 1.038
Neochorouda 1.979 2.132 2.871 3.867
Pentalofos 1.944 2.101 2.618 3.522
TOTAL 6.096 6.581 8.496 11.32
 
The design of the project was pursuant to the Greek Presidential Decree 696/74. The design of the pipelines and the pumping stations was based on a 40-year horizon, while the selection of the electrical and mechanical equipment was based on a 20-year horizon. Specifically, the project included:

  • internal gravity sewer networks of communities of Monolofos (with total length of 11.422m and pipeline diameters of 200mm), Petroto (with total length of 4.900m and pipeline diameters from 200mm to 315mm), N.Philadelfia (with total length of 10.485m and pipeline diameters of 200mm), Mesaio (with total length of 5.580m and pipeline diameters from 200mm to 315mm), Neochoroudas (with total length of 19.780m and pipeline diameters from 200mm to 250mm) and Pentalofo (with total length of 18.180m and pipeline diameters from 200mm to 250mm)
  • external gravity pipeline network (with total length of 23.900m and pipeline diameters from 200mm to 500mm), and external force main pipeline network (with total length of 6.600m and pipeline diameters from 200mm to 280mm). Four (4) underground pumping stations were designed for pumping the wastewater

BENEFIT
The design of the project solved the problem of wastewater management for the communities of Monolofos, Petroto, N.Philadelfia, Mesaio, Neochorouda and Pentalofo of Municipality of Kallithea